Village of Harveysburg

The Village of Harveysburg?project was completed in June of 2014. We removed 18 existing?single-pane steel casement windows in 6 masonry openings and?installed new glass block.?We used the same aluminum channel and mull system with?pre-assembled silicone glazed windows. The job was completed in 3?days.

Before
Before
After
After
After
黄页网址大全免费观看_黄页网站大全免费软件_黄网站男人免费大全